High voltage power line installation on Zatric site

Work done by BETA company

This is photo story example how this hard job is executed on the top of mountain
Zatric under high wind with cold rain, sometimes fog with wind and some times just with cold weather. Team of people with their leader Mr. Berhan Bakija finish this task successfully.

pl_1.jpg (23243 bytes)

Hole ready for laying wooden 12 meter pole.

pl_2.jpg (53788 bytes)

Preparing just hole for the exact size of wooden pole.

pl_3.jpg (35150 bytes)

pl_4.jpg (34331 bytes)

pl_5.jpg (32594 bytes)

pl_6.jpg (29734 bytes)

pl_7.jpg (27350 bytes)

pl_8.jpg (25240 bytes)

pl_9.jpg (29594 bytes)

pl_10.jpg (23200 bytes)

pl_10A_300.jpg (44609 bytes)

Wooden pole is very heavy, few people must hold very tight or ...

pl_11.jpg (27364 bytes)

pl_12.jpg (28521 bytes)

pl_13_300.jpg (28853 bytes)

pl_14.jpg (28251 bytes)

pl_15.jpg (28263 bytes)

1.100 meter long 35 kV power line finaly is ready to be connected to...

pl_1_3phase_connection_point.jpg (28475 bytes)

Point of connection to 35 kV high voltage public utilities.

pl_1_berhan_rudolf_talk_400.jpg (25137 bytes)

Mr. Berhan Bakija and Mr. Rudolf Bosnjak-Site Manager for Zatric site are very happy. 35 kV high voltage power line is ready to be connected on public utilities and provide stable electrical supply to Zatric transmitter site.

pl_1_berhan_team_mobile_talk.jpg (29612 bytes)

Final call through VALA 900, new cellular mobile network to public utilities Electro Kosova to test power line and later to connect this line to Zatric transformer station  35 kV high voltage to 0.4kV low voltage, 3 x 380 volts.