K
T T N High voltage power line installation on Zatric site Work done by BETA company
Hole ready for laying wooden 12 meter pole.
Preparing just hole for the exact size of wooden pole.
Wooden pole is very heavy, few people must hold very tight or ...
1.100 meter long 35 kV power line finaly is ready to be connected to...
Point of connection to 35 kV high voltage public utilities.
Mr. Berhan Bakija and Mr. Rudolf Bosnjak-Site Manager for Zatric site are very happy. 35 kV high voltage power line is ready to be connected on public utilities and provide stable electrical supply to Zatric transmitter site.
Final call through VALA 900, new cellular mobile network to public utilities Electro Kosova to test power line and later to connect this line to Zatric transformer station 35 kV high voltage to 0.4kV low voltage, 3 x 380 volts. Copyright (C) All rights reserved. KTTN, Rudolf Bosnjak, November 2000. |